A modern detached casita with a cedar-clad wall and rooftop solar, in a walled Arizona backyard at golden hour.

Licensed general contractor · AZ ROC #354956

Add a home to
your backyard.

Rental income, property value, or a place for family to land — built by one licensed team from the first site visit to the final inspection.

2025By-right in AZ cities
1,000 ft²Maximum ADU size
5 ftSetback cap by statute
1Team, start to finish

01 — What changed

Arizona stopped saying no.
Now the answer is by right.

HB 2720

The Casita Bill

Signed in May 2024 and effective January 1, 2025. Every Arizona city over 75,000 residents must allow one attached and one detached ADU on any single-family lot — no special use permit, no variance, no public hearing.

HB 2928

County expansion

Signed May 2025. It carried nearly the same rules out to Arizona's counties, with a compliance deadline of January 1, 2026 — so unincorporated lots are covered too.

Limits

What the rules say

Up to 75% of your home's habitable area, capped at 1,000 ft². Setbacks can't be pushed past five feet. Cities can't demand extra parking, can't force your casita to match the house, and can't require you to live on site to rent it long term.

The catch

Your HOA still counts

Both bills leave private covenants intact. If your CC&Rs ban accessory dwellings, the association can still say no — whatever the city allows. We check this in the first week, before you spend a dollar on design.

Statute summaries are provided for orientation. Your lot, your city and your CC&Rs decide the real answer — that's the first thing we confirm.

02 — Why homeowners build one

One structure. Four different lives.

01

Rent it out

A detached casita is a real long-term rental with its own entrance, kitchen and bath. Since 2025 the city can't require you to live on the property to rent it.

Monthly income
The same casita after dark, windows lit warm against the desert sky.

Keep family close, not on top of you

Parents, an adult kid, a caregiver. Same lot, separate front door.

02

Add value to the lot

You're adding permitted, finished, code-compliant square footage with a certificate of occupancy — not a shed.

Property value
03

Work, guests, pool lounge

An office with a full bath. A guest suite. A shaded room off the pool. The permitted envelope is the same — the layout is yours.

Flexible use
04

One team, one number to call

We're the general contractor. Design, engineering, permits, trades, inspections and the certificate of occupancy sit with us — you don't chase subs.

Turnkey

03 — The same yard

Drag it. That's the whole pitch.

The backyard after: a finished detached casita with a deck.
The backyard before: gravel, an old shed and unused space.
Before After

Illustration of a typical build, not a photograph of a specific project.

04 — Models

Three footprints. Everything else is yours.

Every unit is site-built with 2×6 exterior framing and a sealed envelope for Arizona summers. Pick the footprint that fits your lot and we adapt the layout, the openings and the finish.

Axonometric drawing of the studio casita.

The Studio

One open room, full bath, kitchenette. The pool lounge, the office, the guest suite. Fits the tightest side yards.

Footprint
270 – 400 ft²
Layout
Studio · 1 bath
Ceiling
9' flat
Typical build
12 – 16 weeks
Request a quote →
Axonometric drawing of the two-bedroom casita.

The Two-Bed

Full laundry, two bedrooms, a covered patio. Built for family who are staying, not visiting.

Footprint
700 – 1,000 ft²
Layout
2 bed · 1–2 bath
Ceiling
10'
Typical build
20 – 28 weeks
Request a quote →

05 — How it's built

Built for 115°, not for the brochure.

Arizona heat finds every gap in a building. The envelope is where a casita either stays cheap to run for thirty years, or doesn't.

  • 2×6 exterior framing — deeper cavity, more insulation, a site-built structure rather than a lightweight kit.
  • Sealed envelope — spray foam at the roof deck and rim, so the conditioned air stays where you paid to put it.
  • Dual-pane low-E glazing — sized and shaded for the west exposure that punishes most yards here.
  • Solar-ready roof — conduit and structure staged for panels, whether you add them on day one or year five.
  • Desert-rated finishes — stucco and cedar detailing chosen for UV and monsoon, not for a coastal catalogue.
Wall assembly · exterior → interior
Cedar / stucco rainscreen
Ventilated cavity
Weather barrier
2×6 structural framing
Insulated cavity
Service cavity
Interior finish

Representative assembly. Final specification is set on your engineered plans.

06 — How it works

Five steps. One contractor.

  1. 01

    Feasibility

    We pull your parcel, check setbacks, utilities, easements and your CC&Rs, and tell you the largest unit your lot can legally hold. No cost, no obligation.

    Week 1
  2. 02

    Design & engineering

    Floor plan, elevations and 3D views until it's right, then structural, mechanical, electrical and plumbing drawings stamped for submittal.

    Weeks 2 – 6
  3. 03

    Permits

    We submit to your city or county, answer plan-review comments and handle the corrections. You get a copy of everything and nothing to chase.

    Weeks 4 – 12
  4. 04

    Build

    Pad and utilities, framing, envelope, rough-ins, drywall, finishes. One superintendent on site, one weekly update, staged inspections along the way.

    12 – 28 weeks
  5. 05

    Final inspection & keys

    Final city inspection, certificate of occupancy, walkthrough, warranty documents. Then it's a legal dwelling you can move family into or list for rent.

    Handover

Timelines are typical ranges for the Phoenix metro. Plan review times vary by municipality and by season.

07 — Casita estimator

Show us the yard. We'll do the math.

Upload a photo or PDF of your space, draw the buildable area on the map, and get an orientation estimate of what a casita there would cost — plus what it could return over ten years.

  1. 1Your space
  2. 2Size
  3. 3Location
  4. 4Draw it
  5. 5Estimate

Step 1 · Show us the space

A photo of the backyard, a site plan, a survey PDF — whatever you have. Our assistant reads it and pre-fills what it can. You can also skip this and go straight to the numbers.

Step 2 · How much casita

Arizona caps an ADU at 75% of your home's habitable area, up to 1,000 ft². Tell us both and we'll flag it if you're over.

500 ft²

Step 3 · Where is it

Your address centers the map on your lot. We only use it to place the drawing and to check we serve your area.

Step 4 · Draw the buildable area

Tap the corners of the part of your yard where the casita could go. Close the shape and we'll measure it.

0 ft² drawn

Last step · Where do we send it

Your estimate appears right here. We'll also keep a copy so a Prime Builders AZ project manager can walk you through it.

08 — Homeowners

Sample content · replace with real reviews

What people say after the keys.

The part I didn't expect was the permit stage. They submitted, they answered the city, they told me when something moved. I never opened a portal.
Sample testimonialPlaceholder · Chandler, AZ
My mother has her own front door and her own kitchen, and she's forty feet away. That was the whole point and it worked exactly like that.
Sample testimonialPlaceholder · Mesa, AZ
It rented the first month. The summer bills are lower than I budgeted for, which tells me the insulation was not a sales line.
Sample testimonialPlaceholder · Queen Creek, AZ

09 — Questions

Before you call us.

Do I need a permit to build a casita in Arizona?

Yes — always. What changed is that in qualifying cities and counties you no longer need a special use permit, a variance or a public hearing. It's an administrative building permit reviewed against the code, and we handle the whole submittal.

How big can my casita legally be?

The cap is 75% of your primary home's habitable area or 1,000 ft², whichever is smaller. Several cities guarantee a minimum around 650 ft² regardless. The estimator on this page checks that for you if you enter your home's size.

Can I rent it out?

For long-term rental, yes, and cities can't require you to live on the property to do it. Short-term rental is a separate question — some municipalities regulate it independently, so we check your specific city before you plan around it.

What if my HOA doesn't allow it?

Then it's a real obstacle. State law expressly preserves private covenants, so CC&Rs that prohibit accessory dwellings still bind you. We read them in week one — before you pay for design — and tell you honestly if this isn't going to work.

How close to my fence can it sit?

Municipalities can't require a setback greater than five feet from the rear or side line for a detached ADU. Easements, utilities and drainage can still constrain placement, which is what the feasibility check is for.

Does it have to match my house?

Not by law — design-matching mandates were removed. Most homeowners still choose finishes that relate to the main house, because it reads better on the lot and at resale. Your call.

How long does the whole thing take?

Plan on roughly six to twelve months door to door: a few weeks of design, plan review that varies by city, and twelve to twenty-eight weeks of construction depending on size. We give you a schedule at contract, and we tell you when it moves.

What does it cost?

There's no honest single answer before someone stands in your yard — utilities, grading, access and finish level move the number more than square footage does. The estimator above gives you an orientation range from public market data; a real figure comes from a site visit and it's free.

10 — Talk to us

Start with the
feasibility check.

It's free and it's the honest first step: what your lot allows, where the unit can sit, and whether this is worth doing at all.